Concert Calendar
Jul 2014
S M T W T F S
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Search events   >

Student Recital Schedule   >

Upcoming Events

  • Preparatory Concerto Showcase

    February 9, 2016, 7:30 pm
    Kulas Hall

    Cleveland Institute of Music Orchestra
    Carl Topilow, conductor
    Isabel Wu, piano
    Matthew Fields, cello
    Catharine Baek, marimba
  • Women's Committee Luncheon

    February 10, 2016, 11:30 am
    Mayfield Sand Ridge Club, 1545 Sheridan Rd., South Euclid

    Musical Luncheon Series: One Piano Four Hands
    Presented by the CIM Women’s Committee
  • Faculty Recital

    February 10, 2016, 8:00 pm
    Mixon Hall

    Mari Sato, violin
    Annie Fullard, violin
    Laura Shuster, viola
    Tanya Ell, cello
    Tracy Rowell, double bass
    Frank Rosenwein, oboe
    Daniel Gilbert, clarinet
    Anita Pontremoli, piano

    DRAGONETTI   String Quintet No. 18 in C Major
    PROKOFIEV   Quintet for Oboe, Clarinet, Violin, Viola and Double Bass in G minor, Op. 39
    SCHUBERT   Piano Quintet in A Major, D. 667, “Trout”
  • CIM depends on the far-end classroom teacher being actively involved during our videoconference presentations.
  • CIM requires a registration at least four weeks before a class session. This period allows us time to mail teaching materials to the classroom teacher, time for your students to work with the materials, and time for CIM to arrange class presenters and performers.
  • CIM receives IP network service from OARnet and Internet2.
  • CIM uses H.323 devices to complete IP connections. We have successfully connected to sites using Polycom, Tandberg, Lifesize, and VTEL systems.
  • CIM can complete direct or bridged IP connections at speeds from 384 kbps up to 2 Mbps.
  • There are no additional line charges for IP connections with CIM.
  • ISDN calls are bridged by eTech Ohio or your bridge provider.
  • ISDN line charges are back-charged to the far-end site if CIM initiates the connection.
  • For new far-end sites or sites that we have not connected to in the last semester, CIM prefers to complete a test connection approximately a week before a scheduled class session.
  • If a test connection reveals problems, CIM will work with the site and its network provider to resolve network or system problems. Troubleshooting may necessitate the rescheduling of class sessions.
  • CIM originates Standard Definition video signals. CIM can receive both Standard Definition and High Definition video signals.